How to provide the customer with qualified sample as soon as possible? For non-standard custom made rubber product, it is always a very confusing problem! But a rubber product from the customer proposing demand, to material, mold making, making sample, passing inspection only spends 3 days, do you believe it? Yongyong Silicon Rubber is just scu a company, how does it achieve it?
At am 10 December 31, 2016, Yongyong Silicon Rubber received a phone from a customer, requiring to urgently produce 20 samples of Chongqing Lifan automobile antenna rubber casing, but at that time the drawing design of the customer was in conception. Upon receiving the phone from the customer, the engineering department immediately made a review along with the mold engineer at first time, and after receiving the drawing of rubber seal components from the customer at am 12:00, immediately confirmed and reviewed the drawing file, modifying unreasonable structure. Modified material was fed back to the customer for approval at 13:30. Starting from 14:00, mold design, programming (meanwhile template is in preparation) was begun. At 18:30 computer operation for CNC machining began. CNC machine tool continuously machined round the clock, in the morning January 3 the mold is assembled for factory inspection (the factory manager followed up personally in whole process). at 14:00, pre-production material production condition index test is OK, at 14:30 the forming section put the mold on desk for heating, at 16:00 finished product sample was produced. At 16:30 the customer came to the company for appearance approval, site assembly, site test were conducted. After assembling, appearance and function were confirmed qualified by the customer. Meanwhile the customer required material hardness change (changing from 50 degrees to 60 degrees), refining department was organized immediately for compounding of 60 degree material. At 18:30 production of 60 degree product began (visual inspection was conducted simultaneously), at 20:28, 20 samples of auto antenna rubber casing was shipped to Chongqing Lifan on time.